Skip to content

Welcome to Connectus Utilities

Talk To Us
Linkedin-in Facebook-f Instagram
Connect Us Utilities
  • Home
  • About
  • Services
    • Feasibility Studies
    • Temporary Builders Supply (TBS) for Construction
    • Utility Disconnections
    • Utility Diversions
    • New Utility Connections
    • HV Substation Management
    • Section 106 Foul Connection
    • Utility Upgrades
    • Metering & New Energy Contracts
    • Submetering
    • Change of Tenancy
    • Export Contracts
    • G99/G100 Applications
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
  • Home
  • About
  • Services
    • Feasibility Studies
    • Temporary Builders Supply (TBS) for Construction
    • Utility Disconnections
    • Utility Diversions
    • New Utility Connections
    • HV Substation Management
    • Section 106 Foul Connection
    • Utility Upgrades
    • Metering & New Energy Contracts
    • Submetering
    • Change of Tenancy
    • Export Contracts
    • G99/G100 Applications
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
Enquire Now

Section 106 Foul Connection

Talk To Us

Foul Connection Applications and Public Sewer Integration

Providing a complete Section 106 Foul Connection service, managing applications and approvals for connecting new developments to existing public sewers.

Get Started

Section 106 Foul Sewer Connection Service

A Section 106 Sewer Connection Consent (often just called a “106 consent”) is a formal permission granted by the local water authority or sewerage company in the UK, allowing a property or development to connect to the public sewer system.

This consent is named after Section 106 of the Water Industry Act 1991 and is required whenever a developer, property owner, or business intends to connect private drainage systems to public sewers for the first time.

Connectus offers a full management of Section 106 applications for foul sewer connections, for a smooth, hassle-free process.

Our Foul Sewer Connection Service

Connectus offers end-to-end management of Section 106 applications for foul sewer connections for new builds, redevelopments, and commercial projects handling everything from preparing and submitting application forms to providing technical drawings and supporting documentation. We liaise with water authorities to coordinate inspections and approvals, ensuring full compliance with the Water Industry Act and building regulations.

Get Started

Benefits of Partnering with Connectus for your Foul Sewer Connection

Partnering with Connectus means you have a single, experienced point of contact to manage all aspects of your foul sewer connection. Our team brings expertise in water authority processes and compliance standards, ensuring applications are accurate and meet all regulatory requirements.

We offer a proactive approach and fast turnaround, we help you avoid delays, minimise the risk of errors, and reduce the administrative burden on your team.

Who We Work With

We work with businesses in a range of sectors to support their foul sewer connection needs:

house builder plans on table

House Builders & Developers

Supporting residential projects with compliant foul sewer connections from planning through to completion.

Commercial Property Managers

Ensuring safe and legal drainage connections for offices, retail, and other commercial developments.

construction site with utility diversions and connections

Construction & Infrastructure Projects

Assisting large-scale developments with efficient sewer connections approvals.

architects drawing up building plans

Architects & Design Consultants

Providing technical guidance and approval support for foul drainage solutions in new project designs.

Get Started

Our Foul Sewer Connection Process

Section 106 Foul Connection service follows 5 simple steps:

01

Initial Assessment – We start by conducting a review of your site plans and assessing sewer connection requirements to determine the best approach for your project.

02

Application Preparation – Our team will then prepare all necessary forms, technical drawings, and supporting documentation to ensure complete and accurate submission.

03

Submission & Liaison – We then submit your application to the water authority, manage all communications and respond to queries.

04

Approval & Scheduling – Once consent is granted, we will coordinate with the relevant parties to schedule the connection works.

05

Completion & Documentation – After the connection is completed, we provide formal confirmation, compliance records, and guidance to ensure everything meets regulatory standards.

Foul Sewer Connection FAQs

What is a Section 106 foul connection?

A Section 106 foul connection is the formal legal process required to connect a property’s wastewater (foul) system to the public sewer network safely and compliantly,

How long does a Section 106 application take?

Applications typically take 4–8 weeks, depending on the response times of the relevant water authority and the complexity of the project.

Who is responsible for the connection costs?

The connection costs are usually covered by the developer or property owner, including any associated fees for approvals and infrastructure works.

Why is Section 106 approval important?

Section 106 approval ensures that all foul drainage connections meet regulatory standards, protecting the environment, public health, and your property from potential compliance issues.

Get Started

Related Services

We offer a number of services related to your Section 106 Sewer Connection Consent.

Utility Diversions

Connectus provides comprehensive Utility Diversion services, managing the relocation or modification of existing utility infrastructure to enable construction or redevelopment projects.

We offer full management of diversion projects, coordination with utility providers and local authorities, and compliance with safety and regulatory standards.

Learn More

New Water Connections

Got a new project in the pipeline? Having your new water connections up and running is an essential step in any project.

At Connectus we help get projects off the ground with new connections for electricity, gas, water, and telecoms.

From initial planning to installation, we make sure your project gets the essential utilities it needs.

Learn More

Feasibility Studies

Do you have an idea for a new project?
Connectus can assess its feasibility, helping you identify potential challenges, risks, and key considerations before you start. For construction or excavation projects, we conduct a PAS128 survey to locate underground utilities, giving you the insight needed to plan with confidence.

Learn More

Energy Consultancy

Assured Energy provide an open and transparent approach to business utility supply.

Whether you’re a small startup business or a large multi-site enterprise, we can help you get the best deal for your new connection’s permanent energy supply by negotiating contracts and working with trusted suppliers.

Learn More

Ready to Get Started with Your Section 106 Sewer Connection Consent?

To find out more about how we can support your Section 106 Sewer Connection Consent, get in touch with us today on +44(0)330 221 6565, WhatsApp us on +44 (0)793 915 5199 or email info@connectus-utilities.co.uk.

Get ahead of the game...

…with your utility connections – get in touch with us via WhatsApp today.
WhatsApp Us
Connect Us Utilities

In the ever-evolving landscape of utility infrastructure, time is money and every decision that you make should be a strategic one. Connectus Utilities is not just a service – It’s a change on how you should manage your utility needs.

Connectus Utilities is part of The Consultus Group.

Links

  • Home
  • About
  • Services
    • Feasibility Studies
    • Temporary Builders Supply (TBS) for Construction
    • Utility Disconnections
    • Utility Diversions
    • New Utility Connections
    • HV Substation Management
    • Section 106 Foul Connection
    • Utility Upgrades
    • Metering & New Energy Contracts
    • Submetering
    • Change of Tenancy
    • Export Contracts
    • G99/G100 Applications
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
  • Home
  • About
  • Services
    • Feasibility Studies
    • Temporary Builders Supply (TBS) for Construction
    • Utility Disconnections
    • Utility Diversions
    • New Utility Connections
    • HV Substation Management
    • Section 106 Foul Connection
    • Utility Upgrades
    • Metering & New Energy Contracts
    • Submetering
    • Change of Tenancy
    • Export Contracts
    • G99/G100 Applications
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships

Contacts

  • info@connectus-utilities.co.uk
  • +44 (0)330 221 6565
  • +44 (0)793 915 5199
  • info@connectus-utilities.co.uk
  • +44 (0)330 221 6565
  • +44 (0)793 915 5199

Follow Us

Linkedin-in Facebook-f Instagram