Skip to content

Welcome to Connectus Utilities

Talk To Us
Linkedin-in Facebook-f Instagram
Connect Us Utilities
  • Home
  • About
  • Services
    • Change of Tenancy
    • Utility Disconnections
    • Feasibility Reports
    • HV Substation Management
    • Metering
    • Sub-Metering
    • New Utility Connections
    • Sewer/Foul Consent
    • Temporary Builders Supplies
    • Utility Upgrades
    • Utility Diversions
    • Export Contracts
    • G99/G100
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
Menu
  • Home
  • About
  • Services
    • Change of Tenancy
    • Utility Disconnections
    • Feasibility Reports
    • HV Substation Management
    • Metering
    • Sub-Metering
    • New Utility Connections
    • Sewer/Foul Consent
    • Temporary Builders Supplies
    • Utility Upgrades
    • Utility Diversions
    • Export Contracts
    • G99/G100
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
Enquire Now

Utility Diversions

Talk To Us

Utility diversions refer to the process of relocating or altering existing utility infrastructure—such as gas, water, electricity, telecoms, or sewerage systems—when they interfere with planned construction or development.

This may involve moving utility pipes, cables, and conduits to a different location, adjusting their alignment, or temporarily rerouting them to ensure continuous service during construction.

When Are Utility Diversions Needed?

Utility diversions are typically necessary in the following situations:

Infrastructure Projects

Major roadworks, railways, bridges, tunnels, and public transportation projects often require utility diversions to avoid there being any interference with the existing infrastructure.

New Developments

Construction of housing, commercial buildings, or industrial facilities may require relocating their utilities to clear the building site or improve access to the development.

Safety Compliance

Utilities may need to be rerouted to comply with health and safety regulations, particularly if the existing layout presents risks to workers or the public.

Public Realm Improvements

Urban improvement projects, such as widening roads, creating pedestrian zones, or enhancing streetscapes, often necessitate moving utilities out of the way.

Steps Involved in Utility Diversions

Planning and Coordination

Utility diversions require careful coordination among developers, local authorities, and utility providers. Detailed plans are created to outline how each utility will be diverted or altered.

Site Surveys and Mapping

Surveys identify the exact locations and conditions of the existing utilities. Mapping utilities helps in developing an efficient diversion plan and prevents accidental damage.

Design and Approval

Engineers design the new routes or configurations for the utilities, ensuring they meet the necessary standards. This design must often be reviewed and approved by utility providers and relevant regulatory bodies.

Construction and Diversion Work

Utility companies or approved contractors carry out the diversion work, which may involve digging trenches, laying new pipes or cables, and ensuring safe connections are in place.

Testing and Reconnection

Once the utilities are in their new locations, they undergo testing to ensure they’re functioning correctly before being reconnected.

Site Restoration

The site is restored to its original, or an improved state, once the diversion work is complete through repairing any ground or surfaces disrupted during the process.

Types of Utilities Commonly Diverted

Water and Sewer Lines

Pipes carrying water or wastewater may need to be redirected to avoid interference with building foundations or other construction elements.

Gas Pipelines

Gas mains may be diverted to reduce risks, particularly in high-traffic construction areas.

Electricity Cables

Power lines, both underground and overhead, are frequently moved to ensure uninterrupted electricity supply and prevent hazards.

Telecom and Data Lines

Fiber optic cables, broadband lines, and telephone lines may require rerouting to avoid service disruptions.

Challenges of Utility Diversions

Complex Coordination

Working with multiple utility providers requires extensive planning, and disruptions must be minimized for the public and businesses.

Cost

Utility diversions can be costly due to the equipment, labor, and coordination required, especially if it involves complex networks.

Safety and Environmental Considerations

Diversions must follow stringent safety guidelines, especially for gas and electrical lines, and minimise environmental impacts, such as soil and water contamination.

Why Utility Diversions Matter

Utility diversions are essential for allowing infrastructure and development projects to proceed safely and smoothly. They minimize disruption for residents, businesses, and essential services, enabling construction work to progress without risking damage to existing utilities or jeopardizing public health and safety.

 

To find out more about utility diversions, please get in touch with us today on +44(0)330 221 6565, WhatsApp us on +44 (0)793 915 5199 or email info@connectus-utilities.co.uk.

Get ahead of the game...

…with your utility connections – get in touch with us via WhatsApp today.
WhatsApp Us
Connect Us Utilities

In the ever-evolving landscape of utility infrastructure, time is money and every decision that you make should be a strategic one. Connectus Utilities is not just a service – It’s a change on how you should manage your utility needs.

Connectus Utilities is part of The Consultus Group.

Links

  • Home
  • About
  • Services
    • Change of Tenancy
    • Utility Disconnections
    • Feasibility Reports
    • HV Substation Management
    • Metering
    • Sub-Metering
    • New Utility Connections
    • Sewer/Foul Consent
    • Temporary Builders Supplies
    • Utility Upgrades
    • Utility Diversions
    • Export Contracts
    • G99/G100
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships
  • Home
  • About
  • Services
    • Change of Tenancy
    • Utility Disconnections
    • Feasibility Reports
    • HV Substation Management
    • Metering
    • Sub-Metering
    • New Utility Connections
    • Sewer/Foul Consent
    • Temporary Builders Supplies
    • Utility Upgrades
    • Utility Diversions
    • Export Contracts
    • G99/G100
  • Projects
  • Insights
    • Blogs
    • FAQs
  • Partnerships

Contacts

  • info@connectus-utilities.co.uk
  • +44 (0)330 221 6565
  • +44 (0)793 915 5199
  • info@connectus-utilities.co.uk
  • +44 (0)330 221 6565
  • +44 (0)793 915 5199

Follow Us

Linkedin-in Facebook-f Instagram